HVAC System

HVAC System
 

In general engineering industries or godown due to heat load temperature increases in the premises. To provide comfort working condition, it is necessary to ventilate the area so that HVAC Systemtemperature & odor can be controlled to desired level.

In some of the area temperature can be controlled only with ventilation but in hot area where humidity level is low, it is necessary to provide Evaporative cooling system to bring the temperature to desired level.

System capacity is calculated based on heat load & number of air changes required. Pressurization System is generally required to maintain clean manufacturing area or machine room etc. 2 to 3mm pressure is maintained in the area by supplying filtered air in to the room & exhausting naturally through gravity operated damper.

Clean room system:
As per GMP it is necessary to provide clean room system in pharmaceutical industries. It is basically done through properly designed supply & exhaust system.

 

Cyclone Separator

Multiclone Dust Collector

Venturi Scrubber

Packed Bed Scrubber
Rotary Air Lock Valve
Double Cone Valve
Clarifier
Clariflocculator
Thickener
Floating Aerator
Agitator
Flash Mixer
Pressure Sand Filter
Activated Carbon Filter
Dosing Pump
Fixed Surface Aerator
Industrial Fans
Pneumatic Conveying Systems
 
POLLUTION
CONTROL SYSTEMS
 
 
 
 
-----------------------------------------------------------------------------------------------------------------------------------------------------------------
Karyasiddhi Environmental Engineering Co. Pvt. Ltd.
403, The Crescent Business Park, Saki Naka Telephone Exchange, Off Andheri-Kurla Road, Safed Pool,
Mumbai - 400072. Maharashtra,India. Tel : (022) 28515724 / 28592291